![]() Home |
|
||||||
|
3. SYSTEM WATER AUDITS, LEAK DETECTION AND REPAIR A. Implementation Implementation shall consist of at least the following actions:
b) Determine other system verifiable uses; c) Determine total supply into the system; d) Divide metered sales plus other verifiable uses by total supply into the system. If this quantity is less than 0.9, a fullscale system audit is indicated. 2) When indicated, agencies shall complete water audits of their distribution systems using methodology consistent with that described in AWWA#146;s Water Audit and Leak Detection Guidebook. 3) Agencies shall advise customers whenever it appears possible that leaks exist on the customers side of the meter; perform distribution system leak detection when warranted and cost-effective; and repair leaks when found. B. Implementation Schedule
C. Coverage Requirements
D. Requirements for Documenting BMP Implementation 2) Maintain in-house records of audit results or the completed AWWA Audit Worksheets for each completed audit period.
E. Criteria to Determine BMP Implementation Status
2) Agency has conducted a full system audit consistent with methods described by AWWAs Manual of Water Supply Practices, Water Audits and Leak Detection whenever indicated by a pre-screening audit. F. Water Savings Assumptions Unaccounted water losses assumed to be no more than 10% of total water into the water suppliers system. |
|
|